Supply pigging equipment for The new KOT project of Mombasa Port

2022-01-24 15:05

The new KOT project of Mombasa Port is a large-scale EPC oil terminal project integrating design, procurement, construction and trial operation. The main wharf of the project is a high-piled offshore pier-table structure. The main wharf engineering berths are divided into 4 berths, which are arranged in front and rear. The total length of the wharf is 770 meters.

After the new KOT oil terminal is completed, it will become the main artery of Kenya's oil supply, which can increase the oil processing capacity of Mombasa Port by 10 times, effectively alleviate Kenya's oil dilemma, and has a strong strategic significance for promoting the development of Kenya and even East African countries.

Through years efforts of design and study according to the Mombasa port's new pipeline condition,  Shenyang Wensheng are Honor  to supply 22 sets Non-intrusive magnet pig signaller, various kinds of pig for 20inch/24inch/30inch/36inch new constructed pipeline . 

pig signaller

Get the latest price? We'll respond as soon as possible(within 12 hours)
This field is required
This field is required
Required and valid email address
This field is required
This field is required
For a better browsing experience, we recommend that you use Chrome, Firefox, Safari and Edge browsers.