Supplied 6 sets DN1500 Quick opening closure for Uzbekistan Syr Darya 1500 MW Gas Combined Cycle Independent Power Generation Project
We supplied 6 sets of Quick opening closure, Triple clamp Type to Uzbekistan Syr Darya 1500 MW Gas Combined Cycle Independent Power Generation Project.
The Triple clamp type Quick opening closure welded and installed on the filter separator skid successfully.
The triple clamp type QOC size DN1500 ,Through the technical discussion and tests lots of time,we have solved the operation problem. it can easily open and close by one person .
The working performance is very stable and convenient.
project introduction:
The consortium of China Gezhouba Group International Engineering Co., Ltd. and China Energy Construction Group Zhejiang Thermal Power Construction Co., Ltd. won the bid for the main equipment section of the joint venture project of the 1500MW gas combined cycle independent power station project on the Syr Darya River in Uzbekistan
It is reported that the power station is the first gas-fired combined cycle independent power station project signed by a Chinese-funded enterprise in Uzbekistan, and it is also the largest thermal power project signed by Uzbekistan in recent years. The project makes full use of the abundant local natural gas resources, adopts advanced and efficient H-class gas turbines, adopts gas turbines with the highest combustion temperature, the largest single power, the highest efficiency in the world and the design scheme of "zero discharge of waste water". It is the world's leading and efficient green gas turbine. Energy saving and environmental protection projects.